Free Excel Download of Risk Assessment Improvement Measure Implementation Management Log

Risk Assessment and Safety System

Risk Assessment Improvement Measure Implementation Management Register
Free Excel download

Conducting a risk assessment identifies hazardous factors, risk levels, and improvement measures. However, if you stop at simply listing improvement measures on the assessment sheet, it can become difficult to verify later who is responsible, by when the measures must be taken, whether they were actually completed, and whether the risk was reduced after the improvements.

In a risk assessment, identifying risk factors is not the only important step. You must manage the entire process, from establishing corrective measures for the identified risks and verifying that actual actions have been implemented, to notifying workers of the changes if necessary.

We have prepared an Excel spreadsheet for the Risk Assessment Improvement Action Implementation Management Log so that Safety and Health personnel and HR/General Affairs personnel can manage improvement measures following the risk assessment all at once.
Free Download of Risk Assessment Improvement Measure Implementation Management Log
Download the "Risk Assessment Improvement Measure Implementation Management Register Excel" from the attachment, modify it to fit your company's risk assessment procedures, processes, work methods, and improvement measure management standards, and use it accordingly.

๐Ÿ“‹ Contents included in this material

This Excel file is structured not merely to record the improvement measures derived from the risk assessment, but to allow for the management of implementation status, delay days, supporting documents, and effectiveness verification results.
Data organization Things to check and manage
User Guide Order of writing, criteria for status values, precautions for use
Improvement Measure Implementation Register Action Number, Evaluation Date, Evaluation Classification, Workplace, Department, Process
Risk factor record Hazardous and risk factors, current safety measures, areas requiring improvement
Management of improvement measures Improvement measures, types of actions, risk levels before and after improvement
Manager Department in charge, person in charge of execution, collaborating department, approver
Schedule Management Estimated completion date, actual completion date, number of days delayed, next inspection date
Implementation status management Needs review, Planning, In progress, Completed, Effectiveness verified, Further improvement, On hold
Budget and resource management Budget necessity, estimated cost, approval status
Management of supporting documents Location of before and after improvement photos, training records, meeting minutes, work standards, and checklists
Report Summary Total number of cases, completion rate, number of delayed cases, number of urgent/high-urgency incomplete cases
Official Source Links to relevant laws and official reference materials
 
This Excel file is not a statutory form or a substitute for a professional agency assessment. It is a practical management log designed to systematically manage the implementation status and supporting documents of corrective measures following a risk assessment conducted at the workplace.

๐Ÿ”Ž Why Managing the Implementation of Improvement Measures Is Important

Just because "reinforcement of protective devices," "improvement of work procedures," and "strict wearing of protective equipment" are written on the risk assessment sheet does not mean that the improvement measures are complete.
For example, even if a pinch hazard is identified, it is difficult to take actual action without a designated person responsible for installing protective covers and a completion deadline. Similarly, even if a risk of chemical exposure is confirmed, if standards for reconfirming MSDS, checking ventilation, and providing personal protective equipment are not managed separately, the same problems may recur during the next evaluation.
Therefore, the improvement measure implementation management log must be able to answer the following questions.
Confirmation question Items to check in the management ledger
What risk factors have been identified? Department, Process, Task Name, Hazardous/Risk Factors
What measures were taken based on the risk assessment? Items requiring improvement, improvement measures, types of actions
Who takes action? Department in charge, implementer, cooperating department
By when must it be completed? Estimated completion date, actual completion date, number of days delayed
How has the risk level changed? Risk level before improvement, risk level after improvement
Where is the proof of completion? Supporting document ID, file name, storage location
Have you verified the effect? On-site verification results, worker opinions, next inspection date
 
Improvement measures for risk assessment must lead to actual risk reduction, not merely the โ€œcreation of an assessment table.โ€

๐Ÿงญ What corrective measures need to be managed?

The Risk Assessment Improvement Measure Implementation Management Register allows you to manage measures resulting from not only regular risk assessments but also initial, ad-hoc, and ongoing risk assessments.
Evaluation and Action Source Examples of improvement measures
Initial risk assessment Identifying new process risk factors, establishing work procedures, and setting standards for personal protective equipment
Regular risk assessment Improvement of recurring risk factors, verification of the effectiveness of existing measures, supplementation of work standards
Ad-hoc risk assessment Review of additional risks after changes in equipment, raw materials, or work methods
Continuous Risk Assessment Supplementing risk factors based on TBM, pre-work inspection, and worker feedback
Post-accident and near-miss evaluation Measures to prevent recurrence, facility upgrades, and re-conducting training
Reflecting Worker Opinions Improvement of uncomfortable protective equipment, adjustment of work flow, and supplementation of hazard signs
Contractor/Subcontractor Work Coordination of mixed work, access control, and work information sharing
 
If improvement measures identified from various evaluations are scattered across separate evaluation sheets, it is difficult to track their implementation. By operating a single management ledger, you can view the progress and completion status at a glance, regardless of the evaluation categories.

๐Ÿงพ Here is how to use the Risk Assessment Improvement Measure Implementation Management Log

STEP 01

1. Enter the evaluation category and the source of the corrective action.

First, indicate which risk assessment the corrective measures originated from.
  • the first
  • essence
  • rolling admissions
  • Always
  • TBM
  • After the accident
  • etc
If you distinguish the sources, it is easy to identify which assessments frequently require improvement measures and whether the same risk factors are recurring.
For example, you can write it as follows.
Action number Evaluation Classification Departments and Processes Hazardous and dangerous factors Areas for Improvement
RA-2026-001 essence Packaging process Possibility of jamming in the lower part of the conveyor Installation of protective covers and improvement of work procedures
RA-2026-002 rolling admissions Logistics warehouse Risk of collision between forklift and pedestrian Re-marking of pedestrian walkways and movement route education
RA-2026-003 After the accident Washing room Risk of slipping on the floor Replacement of non-slip mat and inspection of drainage
STEP 02

2. Specifically divide the risk factors and improvement measures.

Improvement measures must be written specifically so that their implementation can be verified. If written with phrases like "strict safety management" or "caution required," it will be difficult to determine later whether they have been completed.
Ambiguous record Improved record example
Safety training required Movement route training conducted for the entire logistics team regarding the risk of forklift collisions with pedestrians.
Need to organize Mark floor lines for the storage area in Building A corridor and add a checkbox to the daily final inspection checklist.
Strictly wear protective gear Provide cut-resistant gloves to cutting workers and reflect wearing standards in the work standard manual.
Supplementation of protective devices Check interlock operation after installing the press input guard cover.
Risk Re-evaluation Re-evaluate risk factors for pinching, electric shock, and noise after the introduction of new equipment
 
It is recommended to draft improvement measures so that, if possible, they clearly specify what will be verified, where, who, by when, and with what evidence.
STEP 03

3. Determine the type of action and priority.

It is difficult to process all risk assessment improvement measures at the same pace. Risks with a high probability of accidents or those that could lead to serious accidents must be managed as a priority.
priority Judgment criteria Management method
emergency Immediate possibility of accidents, risk of serious accidents, insufficient statutory safety measures Immediate temporary measures followed by top priority improvement
height Potential for serious injury, repeated exposure, impact on multiple workers Intensive management after assigning a person in charge and deadline
commonly Items that pose risks but are controllable in the short term Improvement within the set deadline
lowness Convenience improvements or long-term review items Set a schedule and budget to track
 
If the types of measures are also classified, improvement measures can be reduced from being overly focused on education or the provision of protective equipment.
Type of action example
eliminate Eliminate unnecessary hazardous work, eliminate risk factors
Replacement Change to low-risk substances, tools, and work methods
Engineering improvements Protective devices, local exhaust ventilation, automation, workbench improvements
Managerial improvement Work procedures, work permits, work sequences, personnel allocation
Education and Training New procedure training, TBM implementation, recurrence prevention training
protective gear Provision of appropriate protective equipment and maintenance of wearing standards
temporary measures Until these measures are taken, access will be restricted, signs posted, and monitors stationed.
 
If possible, it is advisable to first consider measures to reduce the risk itself, such as removal, replacement, or engineering improvements, and to manage education and protective equipment together as complementary measures.
STEP 04

4. Designate the person in charge and the completion deadline.

The most common reason improvement measures are not implemented is that the person in charge and the deadline are ambiguous.
It is recommended to include the following items in the management ledger.
  • Department in charge
  • Executioner
  • Coordinating department
  • approver or final verifier
  • Estimated completion date
  • Actual completion date
  • Delay days
  • Reason for delay
  • Changed completion deadline
  • Next maintenance day
Measures requiring budgeting, purchasing, facility construction, or consultation with external contractors are indicated separately. If simple on-site measures and long-term budget measures are managed in the same way, it is difficult to identify the reasons for delays.
STEP 05

5. Manage progress status with a unified value.

If the progress status is written differently by each person in charge, it is difficult to aggregate the overall status. The following status values โ€‹โ€‹can be used in the management ledger.
Progress status meaning
Needs review A situation requiring further verification of the cause and direction for improvement
Planning Improvement measures, person in charge, and schedule have been determined.
In progress In the process of executing purchasing, construction, training, changes to work procedures, etc.
complete Planned improvement measures applied to the site
Verify the effect A state of re-verifying whether risk has been reduced after improvement
Further improvements Risk remains even after measures are taken, requiring additional countermeasures.
hold Delayed due to budget, process, and schedule issues, requiring temporary measures
 
It is important to distinguish between 'completion' and 'verification of effectiveness.' It is difficult to conclude that risk has actually been reduced simply because equipment has been installed or training has been conducted. Even after improvements, it is advisable to re-verify the effectiveness through on-site inspections and worker feedback.
STEP 06

6. Record the location of the supporting documents as well.

Rather than merely stating that risk assessment improvement measures have been โ€œcompleted,โ€ supporting documentation must be managed.
Examples of supporting documents are as follows.
  • Before and after photos of improvement
  • Risk Assessment Table
  • Revised Work Standard
  • Educational materials
  • Training Attendance List
  • TBM records
  • Protective Equipment Distribution Register
  • Equipment Inspection Checklist
  • Purchase Request
  • Quotation/Purchase Order
  • Construction Completion Certificate
  • Worker Opinion Collection Records
  • Re-inspection Result Report
In practical terms, it is more convenient to record the filename, save location, creation date, and person in charge in the management log rather than attaching the file itself.
STEP 07

7. We examine employee guidance and effectiveness verification together.

If the results of the risk assessment and corrective measures affect work methods, protective equipment, work procedures, access control, or safety rules, workers must be informed to the extent necessary.
Depending on the workplace situation, methods of notification may include safety and health training, information sessions, postings, written materials, electronic means, and pre-work safety inspection meetings.
After completing the improvement measures, please check the effectiveness with the questions below.
  • Were the improvement measures actually applied on-site?
  • Do workers know about the changed procedures or facilities?
  • Have existing risk factors been eliminated or reduced?
  • Has the risk not spread to other processes or other workers?
  • Were protective equipment, work procedures, and training content reflected in the actual work?
  • Do workers complain of inconvenience or danger even after improvements?
  • Are the same risk factors being pointed out repeatedly?
  • Is the next inspection date set?
Merely checking completion status may result in corrective measures being merely a formality. You must manage the verification of effectiveness to confirm whether the risk assessment led to actual improvements.

๐Ÿ—๏ธ Please also manage improvement measures related to contractors and subcontractors separately.

In workplaces with contracting, service, or consignment relationships, new risks may arise when the prime contractor and subcontractors work in the same location or their work sequences overlap.
The following items may be separately indicated in the Risk Assessment Improvement Measure Implementation Management Register.
  • Whether related to contracting or subcontractors
  • Prime Contractor Representative
  • Partner company representative
  • Whether mixed work is involved
  • Whether to share information before work
  • Whether access control and work permits are required
  • Whether joint improvement measures
  • Whether supplier training and TBM are reflected
  • Completion verification entity
It is recommended to distinguish improvement measures related to partner company work from internal department actions and to record the person in charge, details of the consultation, and the method for verifying completion.

โš ๏ธ Common mistakes when managing corrective actions

  • Only improvement measures are listed on the risk assessment table, and implementation status is not tracked separately.
  • Recorded only as โ€œManagement Department Actionโ€ without a person in charge
  • No completion deadline or left only as โ€œfor future reviewโ€
  • It does not distinguish between measures requiring a budget and immediate measures.
  • Did not record the location of supporting documents
  • Failure to distinguish between temporary measures and fundamental improvement measures
  • Treat the implementation of training as improvement completed and do not verify actual behavioral changes
  • Ended the review of engineering improvements solely through the provision of protective equipment.
  • No reason for delay or deadline for change left
  • Worker opinions were received, but whether improvement measures were reflected was not recorded.
  • Failure to check if the same risk factors are recurring
  • Failure to clarify the party responsible for measures related to partner companies
Improvement measure implementation management is not a task for organizing documents, but rather execution management aimed at actually reducing risk factors.

๐Ÿ“Ž Precautions for Using the Risk Assessment Improvement Measure Implementation Management Log

  • This Excel file alone does not determine whether obligations under the Industrial Safety and Health Act have been fulfilled.
  • The actual level of measures may vary depending on the industry, scale, processes, facilities, materials handled, work methods, and accident risks of the workplace.
  • Risk factors requiring corrective measures must be identified through a comprehensive review of risk assessments, on-site inspections, accident investigations, and worker opinions.
  • Improvement measures that do not specify a person in charge and a completion deadline may be omitted from implementation management.
  • Before processing completion, supporting documents and on-site verification results are reviewed together.
  • High-risk incomplete items are managed by establishing temporary measures and additional reporting criteria.
  • Measures requiring budget or personnel are linked to management reporting and the budget formulation process.
  • Specific judgments regarding industrial safety and health, risk assessment, and labor matters may require review by experts or relevant agencies.

๐Ÿ“ฅ Download Risk Assessment Improvement Measure Implementation Management Log again

Able to manage the person in charge, completion deadline, implementation status, supporting documents, and results of effectiveness verification for hazardous and risk factors and improvement measures identified in the risk assessment XLSX Management Log for Safety and Health Managers no see.
โ–ถ Download Risk Assessment Improvement Measure Implementation Management Register in Excel

โ“ Frequently Asked Questions

Q1. If improvement measures are listed in the risk assessment form, is a separate implementation management log required?

Simply listing improvement measures on the risk assessment sheet can make it difficult to track the person in charge, completion deadline, reasons for delay, supporting documents, and results of effectiveness verification. Using a separate implementation management log makes it easy to manage whether actual measures have been completed following the risk assessment.

Q2. When can the corrective measures be considered completed?

The planned measures can be considered completed when they are actually applied to the site and verified through supporting documentation. However, rather than stopping at merely installing equipment or conducting training, it is advisable to confirm the effectiveness by verifying on-site inspections to see if risks have been reduced following the improvements and by gathering feedback from workers.

Q3. How are measures that have exceeded their completion deadline managed?

You must record the reason for the delay, temporary measures, the revised completion deadline, and whether additional reporting is required. Particularly in cases where urgent or high-risk items are delayed, it is advisable to review temporary safety measures, budget adjustments, and the need for management reporting together.

Q4. Should improvement requests raised by employees also be included in the management log?

It is recommended to include worker opinions related to safety and health hazards and risks in the management of corrective measures. Recording whether the feedback was implemented, the reasons for non-implementation, the person in charge, and follow-up notifications can help reduce the likelihood of the feedback collection process becoming merely a formality.

Q5. Can measures taken during ad-hoc risk assessments also be included in the same ledger?

It is recommended to include them. Managing improvement measures identified from ad-hoc risk assessmentsโ€”such as equipment changes, raw material changes, work method changes, and post-accident reassessmentsโ€”in the same ledger makes it easy to check the overall implementation status.

Q6. Can this management ledger be used as a report?

If the source of the corrective measures, the person in charge, the completion deadline, the implementation status, the reason for the delay, supporting documents, and the results of the effectiveness verification are organized, this can be utilized for safety and health meetings, management reports, and safety and health management system inspections. However, you must verify whether additional items are required to comply with the company's internal standards and legal requirements.

๐Ÿ’ฌ When EAP support is needed

The management of risk assessment and corrective action implementation cannot be replaced by an EAP. Risk assessment, facility improvement, changes in work methods, provision of protective equipment, decisions to stop work, and statutory inspections and reporting must be managed within the occupational safety and health management system.
However, employees may experience anxiety, sleep problems, post-accident stress, and job stress following hazardous work, industrial accidents, near misses, or recurring safety and health issues. In such cases, you may recommend EAP as a supplementary channel.
If you experience significant anxiety, sleep problems, post-accident stress, or job stress following an accident or hazardous work, you may utilize EAP counseling channels. EAP does not replace risk assessment, safety measures, work environment improvements, or legal judgments; it is a supplementary channel designed to support the psychological burden of employees.
In cases of suggestions of suicide or self-harm, immediate safety risks, or risks of violence, do not respond solely with general EAP guidance; you must first check emergency routes such as 119, 112, or the suicide prevention hotline 109.

๐Ÿ’ฌ Safety and Health Management System Consultation Inquiry

If corrective measures continue to emerge from the risk assessment but the management of personnel, budgets, completion deadlines, and supporting documents is scattered, the implementation management method following the risk assessment must be reorganized.
Nudge EAP does not replace legal judgments under the Occupational Safety and Health Act or diagnoses by specialized safety and health agencies. However, it can support the operation of the safety and health management system in the field through internal safety and health communication, gathering of worker opinions, management of psychological burden after accidents, and coordination with managers and EAP counseling.

๐Ÿ“š Source and Information

This content and the attached Excel file are practical resources intended to provide general information and assist in managing the implementation status of risk assessment corrective measures. Actual compliance with obligations under the Occupational Safety and Health Act, the appropriateness of the risk assessment, the level of corrective measures, the scope of liability for contractors and subcontractors, and legal judgments may vary depending on the workplace's industry, scale, processes, risk factors, and specific facts. Specific judgments regarding occupational safety and health, legal matters, and labor issues may require review by relevant authorities or experts.
Comments5
  • Unknown User2
    BEST
    ์ˆ˜์‹œ ํ‰๊ฐ€๋‚˜ ์‚ฌ๊ณ  ํ›„ ํ‰๊ฐ€์—์„œ ๋‚˜์˜จ ์กฐ์น˜๋„ ๊ฐ™์€ ๋Œ€์žฅ์— ๋„ฃ๋Š”๋‹ค๋ฉด, ํ‰๊ฐ€๊ตฌ๋ถ„๋ณ„๋กœ ํ•„ํ„ฐ๋งํ•ด์„œ ๋ณด๋Š” ๋ฐฉ์‹์ด ์ข‹์„๊นŒ์š”?
    ์ •๊ธฐํ‰๊ฐ€ ์กฐ์น˜์™€ ๊ธด๊ธ‰ ์กฐ์น˜๊ฐ€ ์„ž์ด๋ฉด ์šฐ์„ ์ˆœ์œ„ ๊ด€๋ฆฌ๊ฐ€ ์ค‘์š”ํ•  ๊ฒƒ ๊ฐ™์Šต๋‹ˆ๋‹ค!! :) 
  • Unknown User3
    ์ฆ๋น™์ž๋ฃŒ ์œ„์น˜๊นŒ์ง€ ๋‚จ๊ฒจ๋‘๋Š” ๊ฒŒ ์€๊ทผํžˆ ํ•ต์‹ฌ์ธ ๊ฒƒ ๊ฐ™์Šต๋‹ˆ๋‹ค. ์‚ฌ์ง„, ๊ต์œก๊ธฐ๋ก, ์ž‘์—…ํ‘œ์ค€์„œ ๊ฐœ์ •๋ณธ์ด ๋”ฐ๋กœ ํฉ์–ด์ ธ ์žˆ์œผ๋ฉด ๋‚˜์ค‘์— ์™„๋ฃŒ ์—ฌ๋ถ€๋ฅผ ์„ค๋ช…ํ•˜๊ธฐ ์–ด๋ ต๋”๋ผ๊ณ ์š”.
  • vexa4821
    ์™„๋ฃŒ์™€ ํšจ๊ณผ ํ™•์ธ์„ ๊ตฌ๋ถ„ํ•œ ๋ถ€๋ถ„์ด ์ข‹์•˜์Šต๋‹ˆ๋‹ค. ์กฐ์น˜๋ฅผ ํ–ˆ๋‹ค๋Š” ๊ธฐ๋ก๋ณด๋‹ค ๊ฐœ์„  ํ›„ ์œ„ํ—˜์ˆ˜์ค€์ด ์‹ค์ œ๋กœ ๋‚ฎ์•„์กŒ๋Š”์ง€ ๋ณด๋Š” ๊ฒŒ ๋” ์ค‘์š”ํ•  ๊ฒƒ ๊ฐ™์•„์š”~!
  • Unknown User1
    ์œ„ํ—˜์„ฑํ‰๊ฐ€์—์„œ ๊ฐœ์„ ๋Œ€์ฑ…์„ ์ ์–ด๋‘๊ณ  ์‹ค์ œ ์ดํ–‰ ์—ฌ๋ถ€๋ฅผ ๋”ฐ๋กœ ์•ˆ ๋ณด๋Š” ๊ฒฝ์šฐ๊ฐ€ ๋งŽ์•„์„œ, ๋‹ด๋‹น์žยท๊ธฐํ•œยท์ฆ๋น™๊นŒ์ง€ ๊ฐ™์ด ๊ด€๋ฆฌํ•˜๋Š” ๋ฐฉ์‹์ด ์‹ค๋ฌด์ ์œผ๋กœ ํ•„์š”ํ•ด ๋ณด์ž…๋‹ˆ๋‹ค.