Record standards for reporting and approving the resumption of work suspension requests at contract and service sites
Record standards for reporting and approving the resumption of work suspension requests at contract and service sites
When a request to stop work is received at a contracted or service site, rather than just recording 'who stopped' What risks existed, to whom they were reported, what improvements were made, and on what grounds was it resumed You must leave it so that it continues.
The work stoppage record is Receipt โ Immediate Action โ Reporting โ Risk Identification โ Corrective Action โ Reconfirmation โ Resumption Approval โ Worker Notification โ Follow-up Inspection Manage it according to the flow. A work stoppage order from the Ministry of Employment and Labor cannot be resumed solely through internal company approval.
๐ 3 Types of 'Stop' to Distinguish First
In contracted or service sites, the term "stop work" may appear the same, but its nature can differ. It is necessary to distinguish between cases where an employer suspends work after identifying imminent danger, cases where a worker voluntarily stops work and evacuates due to imminent danger and reports it, and cases where the Minister of Employment and Labor orders a work suspension following a serious accident.
| division | Key criteria | Precautions for Reporting and Resumption |
|---|---|---|
| Stoppage of work by the employer | Take necessary measures such as immediately suspending work and evacuating in case of imminent danger | Operate internal resumption procedures after confirming risk factors and completion of measures |
| Worker's work stoppage | In case of imminent danger, stop work and evacuate, then report to supervisors, etc., without delay. | Prohibition of adverse treatment for work stoppages with reasonable grounds |
| Ministry of Employment and Labor work stoppage order | In cases where there is an imminent risk of recurrence of a serious accident, etc. | Resumption is not possible with internal company approval alone; legal release procedures are required. |
๐งญ We record risks and action flows at contract and service sites.
The client must take necessary safety and health measures when workers from related subcontractors work at their workplace. If multiple tasks are mixed in the same location, the client must verify the timing, content, and safety and health measures of the work, and adjust the timing and content if there is a risk of danger. When a worker from a cooperating company raises a risk, it is appropriate to handle the matter based on the risks of the relevant work and the on-site control structure, rather than on the grounds that "they are not our employees."
๐ When a request to stop work is received, record at least this item.
| Record Item | Content to leave | example |
|---|---|---|
| reception time | Time when the request, suspension, or evacuation began | 14:07 Verbal request from the worker |
| Requester classification | Company/Role/Contact Information | Company A Piping Work Manager |
| Work location/range | Equipment/Area/Work Name | T-03 Tank Top Piping Replacement |
| Risk Details | Observed facts and urgency | Gas odor, abnormal measurement values |
| Immediate action | Stop, evacuation, access control, energy cutoff, etc. | 6 workers evacuated, valve shut off |
| Reporting subjects | Supervisors of the client and contractor, safety and health managers, etc. | Prime Contractor Safety Team / Contractor Site Manager |
| Risk verification | Basis for inspection, measurement, photography, work permit, etc. | Gas measurement, LOTO status check |
| Improvement measures | Removal, Isolation, Ventilation, Repair, Change of Work Method | Replace leak point after ventilation |
| Reconfirmation | Verify whether the risk is controlled after the measures. | Re-measurement and joint inspection |
| Approval to resume | Approver, Time, Conditions | 15:42 Confirmation of Prime Contractor Safety Manager + Subcontractor Manager |
| Worker notification | Communication of resumption conditions and changes | Resumed after TBM |
| Follow-up management | Recurrence prevention, risk assessment, and work permit revision | Work Procedure Scheduled for Revision |
โ ๏ธ The 'Resumption Approval Form' is not a statutory form in all cases.
Articles 51 and 52 of the Industrial Safety and Health Act do not stipulate that a 'Resumption Approval Form' with the same name must be issued for all internal work suspension cases. However, at contracted or service sites, to prevent work from resuming before the risk is eliminated due to schedule pressures Action Completed โ Reconfirmation โ Approver โ Resumption Time โ Notification to Worker It is a good idea to keep a record of it.
Rather than 'someone said to resume' What risks were there, what was improved, and on what grounds was it determined that resumption was possible It must continue.
๐ซ A work stoppage order from the Ministry of Employment and Labor is different from internal approval to resume.
If the Minister of Employment and Labor orders a suspension of work pursuant to Article 55 of the Industrial Safety and Health Act following a serious accident, the company's internal safety team or site manager cannot resume work based on their own judgment. The employer must request the lifting of the suspension from the competent regional employment and labor office and, in accordance with Article 69 of the Enforcement Rules, must go through the lifting procedure after hearing the opinions of the workers involved regarding improvements to hazardous and dangerous factors.
๐ The order of verification before resumption can be summarized as follows
- Identify the cause โ Specifically identify the hazardous and dangerous factors that triggered the work stoppage.
- Immediate action completed โ Complete necessary measures such as isolation, shutdown, ventilation, maintenance, fall prevention, and energy cutoff.
- Joint confirmation by the client and the contractor โ Depending on the on-site situation and roles, the leaders from both sides verify the results of the measures.
- Reset working conditions โ Adjust work methods, sequence, personnel, protective equipment, work permits, and mixed work schedules.
- Worker Guide โ Share risk factors and changed work methods before resumption.
- Resumption approval and time records โ Recording the approver and resumption time according to internal standards.
- Follow-up inspection โ Check immediately after resumption to ensure that the same risk does not occur again.
๐๏ธ If it is a mixed project, we also look at work from other companies.
Article 64 of the Industrial Safety and Health Act stipulates that when work is performed by the client and related subcontractors at the same location, the timing, content, and safety and health measures of the work must be verified, and if there is a concern regarding risks such as fire or explosion due to mixing, the timing and content of the work must be adjusted. If the reason for suspending work occurred during simultaneous operations, please record the other company's working hours, equipment movement routes, energy cutoff, and interference between open flames, confined spaces, and work at heights.
๐งพ For specific hazardous work, records of prior information provision are also reviewed.
For tasks subject to Article 65 of the Industrial Safety and Health Act, such as the modification, dismantling, demolition, or removal of chemical facilities, internal facility work, and work under Presidential Decree involving risks of suffocation or collapse, there is a specific scope within which safety and health information must be provided in writing prior to the start of work. Since there is a provision stating that the contractor may refuse to proceed with the contracted work if they request necessary information but fail to receive it, it is advisable to manage records of work suspension and resumption by linking them with records of prior information provision.
โ Stop/Resume Log Checklist
| Confirmation items | check |
|---|---|
| Recorded the times of work stoppage requests, evacuations, and reports. | โก |
| I verified the requester's affiliation, role, and work location. | โก |
| It left behind on-site facts that served as the basis for the risk assessment. | โก |
| It was delivered to the respective reporting targets of the client and contractor. | โก |
| The details of immediate measures and improvement measures were recorded separately. | โก |
| There are grounds for verification, such as measurements, inspections, photographs, and work permits. | โก |
| If it was a mixed task, the timing and content of the work were readjusted. | โก |
| Workers were notified of the changes before resumption. | โก |
| Recorded the person who approved the resumption and the time of approval. | โก |
| The results of the follow-up inspection were recorded immediately after the resumption. | โก |
| I distinguished whether it was a work stoppage order from the Ministry of Employment and Labor or an internal work stoppage. | โก |
| Administrative agency orders were controlled to prevent arbitrary resumption prior to official lifting. | โก |
โ FAQ
Q1. Can a subcontractor's employee directly request a work stoppage from the main contractor?
It is appropriate to process requests from subcontractor workers who recognize a risk on-site through safety management procedures. While individual rights and reporting relationships should be reviewed on a case-by-case basis, please also verify the contractor's safety and health measures and obligations to coordinate mixed work.
Q2. Is it mandatory to record the name of the worker who requested the work stoppage?
While affiliation and contact information may be necessary for incident response and fact-checking, it is advisable to avoid leaving unnecessary personally identifiable information extensively in general improvement records or shared copies.
Q3. If the prime contractor approves the resumption, can the subcontractor start work immediately?
Approval by the client alone cannot be uniformly considered sufficient. Each party must satisfy their respective responsibilities and on-site procedures, such as the contractor's safety measures, work permits, and verification of the work supervisor.
Q4. Can work be resumed with internal approval even after a work stoppage order from the Ministry of Employment and Labor?
No. The statutory lifting procedure applies to a work suspension order issued under Article 55 of the Industrial Safety and Health Act.
Recommended Posts
๐ Next step
Do not let work stoppage requests be decided solely by on-site judgment; review your internal forms and approving authorities to ensure the entire processโreceipt โ risk identification โ corrective action โ joint verification โ resumption โ follow-up inspectionโis seamlessly connected.
Inquire about Safety and Health & Organizational Support Operations โ๐ Source and Verification Criteria
- Articles 51, 52, and 55 of the Industrial Safety and Health Act
- Articles 63 and 64 of the Industrial Safety and Health Act
- Article 65 of the Industrial Safety and Health Act
- Article 69 of the Enforcement Rules of the Industrial Safety and Health Act
- Ministry of Employment and Labor Legal Interpretation ยท Meaning of Contractor's Obligation to Adjust Hazardous Work
This document summarizes general practical standards for documenting the process of requesting and resuming work suspensions at contracted and service sites. It does not imply that the same statutory 'Resumption Approval Form' is required for all internal work suspensions, and separate statutory lifting procedures apply to work suspension orders issued by the Minister of Employment and Labor. Applicable regulations may vary depending on the contract structure, type of work, occurrence of accidents, and whether the order is from an administrative agency. Date of legal verification: September 22, 2026.
Most Engaging Posts in the Community
- 0160026.10.22
- 0260026.10.22
- 03CommentsWe also have a lot of short-term contract workers during peak season, so I get confused every time I have to handle the training for rehired employees. I'm also curious how other places handle cases where contracts are renewed immediately without any gaps.132226.10.21
- 01coach AnswerHello, this is Nudge EAP โบ๏ธ You should group tasks based on whether the actual work type and conditions are the same, rather than the process name. Tasks can be considered the same if the worker posture, number of repetitions and time, handling weight and frequency, movement, and equipment and tools are similar. Therefore, even within the same assembly process, it is better to separate "seated assembly" and "standing assembly while moving materials" into separate tasks. First, list the detailed tasks within the process and compare them using the criteria above; separating only the tasks with significant differences makes organization easier, even with a large workforce. If there are multiple tasks under the same conditions, you can select a representative sample that includes the worker with the highest workload. The KOSHA guide suggests using at least two tasks with high work intensity as a sample when there are 10 or fewer identical tasks. Shifts can be grouped together if the equipment, workload, speed, and personnel are the same, but if the conditions differ, please separate them by shift. For rotation workers, you can make a judgment by recording all detailed tasks performed during the day, along with the time and frequency of each. For the final classification, confirm the opinions of on-site workers, and if you record the basis for the grouping on the survey form, it will be easier to explain during inspections.753326.09.18
- 02CommentsThe distinction between receiving a report and reaching a conclusion is important. Global HR teams should secure immediate protection and confidentiality before trying to decide whether the conduct legally qualifies as harassment.734426.09.02
- 03coach AnswerHello, this is Nudge EAP.โบ๏ธ The simplest method is for employees to simply receive guidance and apply directly, as the company does not transfer personal information. If you want a health manager to forward a name and contact information to an EAP agency for contact, it is safer to explain the receiving agency, purpose, items, retention period, and the right to refuse consent, and to obtain clear consent from the individual. Since checkup results and symptoms are sensitive health information, do not consider them included in the existing health checkup consent; instead, please write down only the content to be conveyed and obtain separate consent. In practice, it is common to separate the options into โ consent for forwarding name and contact information and โก consent for forwarding checkup results and symptoms, ensuring that there is no disadvantage in using the EAP even if the second option is not agreed to. The burden of repeating explanations can be reduced by providing the option for employees to send a summary of their consultation request, written directly by the employee, to the agency. However, since the wording and procedures may vary depending on whether the contract with the EAP agency involves the outsourcing of personal information processing or the provision of information to a third party, please review the contract details with your in-house personal information manager before implementation. It is a good idea to define the scope of responses in advance to the company to prevent unnecessary feedback regarding consultation requests or their content.718926.09.21
- 04
- 05
- 06
- 07
- 08
- 09
- 10
- 04
- 05
- 06
- 07
- 08
- 09
- 10