Record standards for reporting and approving the resumption of work suspension requests at contract and service sites

Serious Accidents and Occupational Safety and Health Act

Record standards for reporting and approving the resumption of work suspension requests at contract and service sites

When a request to stop work is received at a contracted or service site, rather than just recording 'who stopped' What risks existed, to whom they were reported, what improvements were made, and on what grounds was it resumed You must leave it so that it continues.

short answer
The work stoppage record is Receipt โ†’ Immediate Action โ†’ Reporting โ†’ Risk Identification โ†’ Corrective Action โ†’ Reconfirmation โ†’ Resumption Approval โ†’ Worker Notification โ†’ Follow-up Inspection Manage it according to the flow. A work stoppage order from the Ministry of Employment and Labor cannot be resumed solely through internal company approval.

๐Ÿ“Œ 3 Types of 'Stop' to Distinguish First

In contracted or service sites, the term "stop work" may appear the same, but its nature can differ. It is necessary to distinguish between cases where an employer suspends work after identifying imminent danger, cases where a worker voluntarily stops work and evacuates due to imminent danger and reports it, and cases where the Minister of Employment and Labor orders a work suspension following a serious accident.

division Key criteria Precautions for Reporting and Resumption
Stoppage of work by the employer Take necessary measures such as immediately suspending work and evacuating in case of imminent danger Operate internal resumption procedures after confirming risk factors and completion of measures
Worker's work stoppage In case of imminent danger, stop work and evacuate, then report to supervisors, etc., without delay. Prohibition of adverse treatment for work stoppages with reasonable grounds
Ministry of Employment and Labor work stoppage order In cases where there is an imminent risk of recurrence of a serious accident, etc. Resumption is not possible with internal company approval alone; legal release procedures are required.

๐Ÿงญ We record risks and action flows at contract and service sites.

The client must take necessary safety and health measures when workers from related subcontractors work at their workplace. If multiple tasks are mixed in the same location, the client must verify the timing, content, and safety and health measures of the work, and adjust the timing and content if there is a risk of danger. When a worker from a cooperating company raises a risk, it is appropriate to handle the matter based on the risks of the relevant work and the on-site control structure, rather than on the grounds that "they are not our employees."

๐Ÿ“‹ When a request to stop work is received, record at least this item.

Record Item Content to leave example
reception time Time when the request, suspension, or evacuation began 14:07 Verbal request from the worker
Requester classification Company/Role/Contact Information Company A Piping Work Manager
Work location/range Equipment/Area/Work Name T-03 Tank Top Piping Replacement
Risk Details Observed facts and urgency Gas odor, abnormal measurement values
Immediate action Stop, evacuation, access control, energy cutoff, etc. 6 workers evacuated, valve shut off
Reporting subjects Supervisors of the client and contractor, safety and health managers, etc. Prime Contractor Safety Team / Contractor Site Manager
Risk verification Basis for inspection, measurement, photography, work permit, etc. Gas measurement, LOTO status check
Improvement measures Removal, Isolation, Ventilation, Repair, Change of Work Method Replace leak point after ventilation
Reconfirmation Verify whether the risk is controlled after the measures. Re-measurement and joint inspection
Approval to resume Approver, Time, Conditions 15:42 Confirmation of Prime Contractor Safety Manager + Subcontractor Manager
Worker notification Communication of resumption conditions and changes Resumed after TBM
Follow-up management Recurrence prevention, risk assessment, and work permit revision Work Procedure Scheduled for Revision

โš ๏ธ The 'Resumption Approval Form' is not a statutory form in all cases.

Articles 51 and 52 of the Industrial Safety and Health Act do not stipulate that a 'Resumption Approval Form' with the same name must be issued for all internal work suspension cases. However, at contracted or service sites, to prevent work from resuming before the risk is eliminated due to schedule pressures Action Completed โ†’ Reconfirmation โ†’ Approver โ†’ Resumption Time โ†’ Notification to Worker It is a good idea to keep a record of it.

The essence of the record
Rather than 'someone said to resume' What risks were there, what was improved, and on what grounds was it determined that resumption was possible It must continue.

๐Ÿšซ A work stoppage order from the Ministry of Employment and Labor is different from internal approval to resume.

If the Minister of Employment and Labor orders a suspension of work pursuant to Article 55 of the Industrial Safety and Health Act following a serious accident, the company's internal safety team or site manager cannot resume work based on their own judgment. The employer must request the lifting of the suspension from the competent regional employment and labor office and, in accordance with Article 69 of the Enforcement Rules, must go through the lifting procedure after hearing the opinions of the workers involved regarding improvements to hazardous and dangerous factors.

๐Ÿ” The order of verification before resumption can be summarized as follows

  1. Identify the cause โ€” Specifically identify the hazardous and dangerous factors that triggered the work stoppage.
  2. Immediate action completed โ€” Complete necessary measures such as isolation, shutdown, ventilation, maintenance, fall prevention, and energy cutoff.
  3. Joint confirmation by the client and the contractor โ€” Depending on the on-site situation and roles, the leaders from both sides verify the results of the measures.
  4. Reset working conditions โ€” Adjust work methods, sequence, personnel, protective equipment, work permits, and mixed work schedules.
  5. Worker Guide โ€” Share risk factors and changed work methods before resumption.
  6. Resumption approval and time records โ€” Recording the approver and resumption time according to internal standards.
  7. Follow-up inspection โ€” Check immediately after resumption to ensure that the same risk does not occur again.

๐Ÿ—๏ธ If it is a mixed project, we also look at work from other companies.

Article 64 of the Industrial Safety and Health Act stipulates that when work is performed by the client and related subcontractors at the same location, the timing, content, and safety and health measures of the work must be verified, and if there is a concern regarding risks such as fire or explosion due to mixing, the timing and content of the work must be adjusted. If the reason for suspending work occurred during simultaneous operations, please record the other company's working hours, equipment movement routes, energy cutoff, and interference between open flames, confined spaces, and work at heights.

๐Ÿงพ For specific hazardous work, records of prior information provision are also reviewed.

For tasks subject to Article 65 of the Industrial Safety and Health Act, such as the modification, dismantling, demolition, or removal of chemical facilities, internal facility work, and work under Presidential Decree involving risks of suffocation or collapse, there is a specific scope within which safety and health information must be provided in writing prior to the start of work. Since there is a provision stating that the contractor may refuse to proceed with the contracted work if they request necessary information but fail to receive it, it is advisable to manage records of work suspension and resumption by linking them with records of prior information provision.

โœ… Stop/Resume Log Checklist

Confirmation items check
Recorded the times of work stoppage requests, evacuations, and reports. โ–ก
I verified the requester's affiliation, role, and work location. โ–ก
It left behind on-site facts that served as the basis for the risk assessment. โ–ก
It was delivered to the respective reporting targets of the client and contractor. โ–ก
The details of immediate measures and improvement measures were recorded separately. โ–ก
There are grounds for verification, such as measurements, inspections, photographs, and work permits. โ–ก
If it was a mixed task, the timing and content of the work were readjusted. โ–ก
Workers were notified of the changes before resumption. โ–ก
Recorded the person who approved the resumption and the time of approval. โ–ก
The results of the follow-up inspection were recorded immediately after the resumption. โ–ก
I distinguished whether it was a work stoppage order from the Ministry of Employment and Labor or an internal work stoppage. โ–ก
Administrative agency orders were controlled to prevent arbitrary resumption prior to official lifting. โ–ก

โ“ FAQ

Q1. Can a subcontractor's employee directly request a work stoppage from the main contractor?

It is appropriate to process requests from subcontractor workers who recognize a risk on-site through safety management procedures. While individual rights and reporting relationships should be reviewed on a case-by-case basis, please also verify the contractor's safety and health measures and obligations to coordinate mixed work.

Q2. Is it mandatory to record the name of the worker who requested the work stoppage?

While affiliation and contact information may be necessary for incident response and fact-checking, it is advisable to avoid leaving unnecessary personally identifiable information extensively in general improvement records or shared copies.

Q3. If the prime contractor approves the resumption, can the subcontractor start work immediately?

Approval by the client alone cannot be uniformly considered sufficient. Each party must satisfy their respective responsibilities and on-site procedures, such as the contractor's safety measures, work permits, and verification of the work supervisor.

Q4. Can work be resumed with internal approval even after a work stoppage order from the Ministry of Employment and Labor?

No. The statutory lifting procedure applies to a work suspension order issued under Article 55 of the Industrial Safety and Health Act.

Recommended Posts

๐Ÿ‘‰ Next step

Do not let work stoppage requests be decided solely by on-site judgment; review your internal forms and approving authorities to ensure the entire processโ€”receipt โ†’ risk identification โ†’ corrective action โ†’ joint verification โ†’ resumption โ†’ follow-up inspectionโ€”is seamlessly connected.

Inquire about Safety and Health & Organizational Support Operations โ†’

๐Ÿ“š Source and Verification Criteria

This document summarizes general practical standards for documenting the process of requesting and resuming work suspensions at contracted and service sites. It does not imply that the same statutory 'Resumption Approval Form' is required for all internal work suspensions, and separate statutory lifting procedures apply to work suspension orders issued by the Minister of Employment and Labor. Applicable regulations may vary depending on the contract structure, type of work, occurrence of accidents, and whether the order is from an administrative agency. Date of legal verification: September 22, 2026.

#MajorAccident #Industrial Safety and Health Act #Contract Management #StopTask
Comments4
  • Unknown User4
    ์›์ฒญ์ด๋ž‘ ํ˜‘๋ ฅ์—…์ฒด๊ฐ€ ๊ฐ™์ด ์žˆ๋Š” ํ˜„์žฅ์€ ์ตœ์ข… ์žฌ๊ฐœ ํŒ๋‹จ์„ ๋ˆ„๊ฐ€ ํ•˜๋Š”์ง€ ๋ฏธ๋ฆฌ ์ •ํ•ด๋‘์ง€ ์•Š์œผ๋ฉด ์‹ค์ œ ์ƒํ™ฉ์—์„œ ํ˜ผ์„ ์ด ํด ๊ฒƒ ๊ฐ™์•„์š”
  • Unknown User3
    ์ž‘์—…์ค‘์ง€ํ•œ ์‹œ์ ๋ณด๋‹ค ์–ด๋–ค ์กฐ์น˜๊ฐ€ ์™„๋ฃŒ๋ผ์„œ ์ž‘์—…์„ ์žฌ๊ฐœํ–ˆ๋Š”์ง€ ๊ทผ๊ฑฐ๋ฅผ ๋‚จ๊ธฐ๋Š”๊ฒŒ ๋” ์ค‘์š”ํ•˜๊ฒ ๋„ค์š”
  • Unknown User2
    ์›์ฒญ์ด๋ž‘ ํ˜‘๋ ฅ์—…์ฒด ๋‘˜๋‹ค ํ™•์ธํ•ด์•ผ ํ•˜๋Š” ํ˜„์žฅ์ด๋ฉด ์ตœ์ข… ์žฌ๊ฐœ ํŒ๋‹จ์„ ๋ˆ„๊ฐ€ ํ•˜๋Š”์ง€ ๋‚ด๋ถ€ ์ ˆ์ฐจ์— ๋ฏธ๋ฆฌ ์ •ํ•ด๋‘๋Š”๊ฒŒ ํ•„์š”ํ•˜๊ฒ ๋„ค์š”
  • Unknown User1
    ์ž‘์—…์ค‘์ง€ ์ž์ฒด๋ณด๋‹ค ์–ด๋–ค ์กฐ์น˜๊ฐ€ ๋๋‚ฌ๊ธฐ ๋•Œ๋ฌธ์— ๋‹ค์‹œ ์‹œ์ž‘ํ–ˆ๋Š”์ง€๋ฅผ ๋‚จ๊ธฐ๋Š”๊ฒŒ ํ•ต์‹ฌ์ด๋„ค์š”. ํ˜„์žฅ์—์„œ๋Š” ์žฌ๊ฐœ์‹œ๊ฐ„๋งŒ ๊ธฐ๋กํ•˜๊ณ  ๋„˜์–ด๊ฐ€๋Š” ๊ฒฝ์šฐ๋„ ์žˆ์„ ๊ฒƒ ๊ฐ™์•„์š”

Most Engaging Posts in the Community

See more in Best Posts (Real-Time)